Location
Maharashtra / Gujarat
Client
L&T
Period
Ongoing
Value
₹21.4 Cr
ACEEPL is executing tunnel works on the Mumbai–Ahmedabad High-Speed Rail (bullet train) corridor as a specialist contractor to L&T — India's most ambitious rail programme. The package covers underground excavation and support works delivered to the exacting standards of the national high-speed rail authority.
Engineering Challenges
- 01
Precision tunnelling to high-speed-rail alignment tolerances
- 02
Sustained production rates demanded by a national flagship programme
- 03
Rigorous third-party quality and safety compliance on a marquee corridor
Engineering Solutions
Experienced tunnelling crews and owned plant mobilised for continuous operation
Structured excavation-and-support cycles with daily survey control
Full quality-management system with documented hold-point inspections
Construction Methodology
Systematic drill, excavate, and support tunnelling with continuous geotechnical monitoring and survey-controlled alignment.
Project Statistics
Technologies Used
Similar Requirements?
Our engineering team is ready to discuss your project scope and mobilisation timeline.